Building energy development of the site of 3i Development Ltd. using renewable energy

During the project “Building energy development of the site of 3i Development Ltd. using renewable energy” GINOP-4.1.1-8-4-4-16-2018-00337, Szeged Kollégiumi street 7. Office, warehouse building with a useful floor area of 453.7 m2 we developed the property in terms of building energy, for which we built a solar system with renewable energy. During the building energy developments, the following tasks were realized.

Placement of thermal insulation above the suspended ceiling: Placement of floor thermal insulation material, on a horizontal surface, between cushion trees or false floor support structure, with fibrous insulation material (glass wool, rock wool) ISOVER DOMO 18 180 mm glass wool thermal insulation felt, ËçD = 0.039 (W / mK) 500m2.

External thermal insulation: Facade frame scaffolding, made of metal frame, with floor planks, railings, footboards, Outdoor plastering profiles, for retrofit (panel) thermal insulation system (EPS), polystyrene, PVC, aluminum, stainless steel, galvanized steel, fiberglass, for thermal insulation 30 – 160 mm, for positive corners MASTERPLAST Thermomaster PVC edge protector with 10 + 10 cm fiberglass mesh, 255m Outdoor plastering profiles, for retrofit (panel) thermal insulation system (EPS), stainless steel, aluminum, 30 – 160 mm for thermal insulation, plinth starting profiles for straight walls THERMOMASTER UL, outdoor plinth starting profile for straight walls 150 mm for subsequent thermal insulation, aluminum -106m. Facade thermal insulation with fiberglass reinforcement.

Establishment of a small household-scale power plant with photovoltaic solar panels and grid-connected inverter. Solar cell Kyoto 270 Pure poly 12.15 kWp 45pcs 12000 kWh Inverter Fronius Symo 10.0-3-M 1pc Fittings for high-current components, UV-resistant solar cables, connectors, solar cell support, AC and DC side surge protection.

Door and window replacement: Type: Gealan doors, windows, Gealan plastic profile system, galvanized profile steel reinforcement Hardware: windows, balcony doors: Roto NT one-handed operating opening-tilting fittings.

Modernization of heating and domestic hot water system. Installation of a gas-fired combined heating and water heater. Up to 40 kW Viessmann Vitodens 100-W Gas-fired condensing boiler, power: 35 kW (50/30 ° C).

The title of the project of 3i Development and Sevices Ltd.. “Building energy development of the site of 3i Development Ltd. using renewable energy” contract number GINOP-4.1.1-8-4-4-16-2018-00337. Amount of non-refundable support (44.75%): HUF 9,875,446, loan requested within the framework of the construction HUF 5,588,987, total cost HUF 22,066,262

Start of project implementation 27.09.2018.

Physical completion of the project 10.08.2019.